The new NCG02 permit was issued and became effective October 1, 2015. We have concluded electronic COC renewal and mailed out paper renewal packages as of December 31, 2015. The 2015 Renewal Print Package includes the GP, Technical Bulletin, and revised DMR Forms. Here is a list of COCs that have been accessed on-line with other status notes. The following list is provided for informational purposes only and accurate as of the date of posting: Active NPDES Stormwater Permit List Updated 12/6/2015
NPDES Industrial Stormwater General Permits click here. State Stormwater/Post-Construction Projects click here. Looking for the Stormwater Permitting Interactive Map? NPDES Stormwater ProgramThe National Pollutant Discharge Elimination System (NPDES) stormwater permitting program regulates three types of activities: Industrial activities that fall in one of 10 categories; Municipal Separate Storm Sewer Systems (MS4s); and Construction activities that disturb an acre or more. List of Covered Activities ♦ General Permits ♦ Application Forms ♦ No Exposure ♦ Phase II MS4 Resources State Stormwater ProgramsThe State Stormwater Permitting Programs regulate site development and post-construction stormwater runoff control. Areas subject to these permit programs include all 20 coastal counties, and various other counties and watersheds throughout the state. Areas subject can be found using the Interactive Stormwater Permitting Map Viewer. What does Phase II have to do with State Stormwater? Coastal Stormwater ♦ Forms & Documents ♦ Post-Construction Info Flyer Watershed & Impaired Waters InformationNC TMDLs & Impaired Waters ♦ List of NC Impaired Waters (303(d) List) ♦ DWR Impaired Waters Map NEW - 2014 Approved 303(d) List
|